Photo Gallery

    Recent Projects

    Portage Overpass

    Brandon Agricultural Research and Development centre

    Swan River Elevator

     

    Overpass Demolition 

    Portage la Prairie Bypass 2022


    Swan River Elevator

    Brandon Agricultural Research and Development centre

    Swan River Elevator


    Elevator Demolition to make room for new structure. 

    Swan River, MB 2022


    Scope included: 

    • Structure removal
    • Bin removal 
    • Scale removal 
    • Rail line removal

    Brandon Agricultural Research and Development centre

    Brandon Agricultural Research and Development centre

    Brandon Agricultural Research and Development centre

     

    Building Demolition for the Agriculture and Agri-Food Canada.  Achieved 99% Landfill Diversion on the Project.

    Brandon, MB: 2021/2022

    • General Contractor
    • Asbestos Abatement
    • Utility Disconnect and Capping
    • Building Demolition
    • Contaminated Soil Removal
    • Site Remediation and Parking Lot Construction

    Carman Water Treatment Plant and Water Tower

    Carman Water Treatment Plant and Water Tower

    Brandon Agricultural Research and Development centre

    Building Demolition for the Manitoba Water Services Board and the Town of Carman. Scope included Commercial Building Demolition and Water Tower dismantling. Site Required asbestos removal, utility disconnect and capping, foundation removal, backfill and site remediation.

    Carman, MB: Fall 2021/2022

    • General Contractor
      • Asbestos Abatement
    • Utility Disconnect and Capping
    • Building Demolition
    • Water Tower Dismantling
    • Site Remediation

    Daly Bridge Overpass Building Demolition

    Carman Water Treatment Plant and Water Tower

    Daly Bridge Overpass Building Demolition

    Building Demolition for Manitoba Infrastructure located along 18th St Brandon between Rosser and Stickney Ave. Scope included 2 Full Commercial Building Demolitions, 3 Housing Demolitions and one Partial Commercial Building Separation. Sites Required asbestos removal, utility disconnect and capping, foundation removal, backfill and site remediation.

    Brandon, MB: Future Site of 18th St. Bridge Construction

    2021

    • General Contractor
    • Asbestos Abatement
    • Utility Disconnect and Capping
    • Building Demolition
    • Site Remediation
    • Selective Structure Demolition

    Former Woodlands School Demolition

    Carman Water Treatment Plant and Water Tower

    Daly Bridge Overpass Building Demolition

    Building Demolition for the Interlake School Division located in Woodlands, MB. Scope included a 22,000 sq. ft building demolition. Site Required Asbestos Removal, contaminated soil removal and site remediation.

    2021

    • General Contractor
    • Asbestos Abatement
    • Building Demolition
    • Contaminated Soil Removal
    • Site Remediation

    Kapyong Barracks

    Kapyong Barracks

    Kapyong Barracks

    Formerly part of Canadian Forces Base Winnipeg, the Kapyong Barracks property is located between the Tuxedo and  River Heights neighbourhoods in southwest Winnipeg. The 65 hectare property contained 23 Building sites requiring hazardous material abatement and demolition. The project also included removal of underground services on the property including 5K of steam line and 5K of water line and underground bunkers.

    2019-2021

    • Route 90 Winnipeg, MB
    • General Contractor (joint venture partner)
      Asbestos Abatement, PCB, Lead, Mercury
      Building Demolition

    • Demolition Projects

    Total Demolition

    Copyright © 2023 Total Demolition - All Rights Reserved.

    Powered by GoDaddy

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept