Overpass Demolition
Portage la Prairie Bypass 2022
Elevator Demolition to make room for new structure.
Swan River, MB 2022
Scope included:
Building Demolition for the Agriculture and Agri-Food Canada. Achieved 99% Landfill Diversion on the Project.
Brandon, MB: 2021/2022
Building Demolition for the Manitoba Water Services Board and the Town of Carman. Scope included Commercial Building Demolition and Water Tower dismantling. Site Required asbestos removal, utility disconnect and capping, foundation removal, backfill and site remediation.
Carman, MB: Fall 2021/2022
Building Demolition for Manitoba Infrastructure located along 18th St Brandon between Rosser and Stickney Ave. Scope included 2 Full Commercial Building Demolitions, 3 Housing Demolitions and one Partial Commercial Building Separation. Sites Required asbestos removal, utility disconnect and capping, foundation removal, backfill and site remediation.
Brandon, MB: Future Site of 18th St. Bridge Construction
2021
Building Demolition for the Interlake School Division located in Woodlands, MB. Scope included a 22,000 sq. ft building demolition. Site Required Asbestos Removal, contaminated soil removal and site remediation.
2021
Formerly part of Canadian Forces Base Winnipeg, the Kapyong Barracks property is located between the Tuxedo and River Heights neighbourhoods in southwest Winnipeg. The 65 hectare property contained 23 Building sites requiring hazardous material abatement and demolition. The project also included removal of underground services on the property including 5K of steam line and 5K of water line and underground bunkers.
2019-2021
Total Demolition
Copyright © 2023 Total Demolition - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.